Paver calculator
Standard 4 × 8 in pavers take 4.5 pavers per square foot, plus 10% for herringbone cuts (5% for running bond). A 12 × 16 ft patio (192 sq ft) in herringbone needs 951 pavers, 6 tons of gravel base at 6 in and 1 yd³ of bedding sand.
Updated · Same math as the AreaPal app's estimates
How many pavers do I need?
951pavers
2pallets
6tons
$1,920–$4,608
Paver patio installed, $10–$24 per sq ft, from LawnStarter, November 2026- Bedding sand, 1 in
- 1 yd³
- Polymeric sand, 50 lb
- 4 bags
- Edge restraint, 8 ft pieces
- 7 pieces
- Area
- 192 sq ft
Pattern waste 5–15%, base compaction 20%. Same math as the AreaPal app's paver estimate.
Step 2 · the real size
Measure the real job in AreaPal
A typed rectangle is a guess. Draw the outline on the satellite map and the estimate uses the exact area, with the same math as this calculator.
Draw it on the map
Tap the corners on the satellite view, or walk the edge with GPS.
Satellite map or GPS walkGet the exact area
Square feet, acres and every edge length, as you tap.
Cut-outs taken offCount it and quote it
The estimate counts the materials; the quote prices them with your own costs.
Same math as this page
How do you calculate pavers for a patio?
Pavers = area × (1 + pattern waste) × pavers per sq ft (4.5 for 4 × 8 in). Pallets = laid area ÷ pallet coverage (about 110 sq ft). Base = area × 6 in ÷ 12 ÷ 27 × 1.20 for compaction × 1.40 t per yd³. Sand = area × 1 in ÷ 12 ÷ 27. Polymeric sand: one 50 lb bag per 60 sq ft.
How much waste for each paver pattern?
| Pattern | Waste | 4 × 8 in pavers per 100 sq ft |
|---|---|---|
| Running bond | 5% | 473 |
| Basket weave | 5% | 473 |
| Herringbone 90° | 10% | 495 |
| Herringbone 45° | 15% | 518 |
| Circles and fans | 15% | 518 |
Paver job cost: what contractors charge
Ranges from public cost guides, as each one states them. They're what a contractor charges for the work, not material prices and not AreaPal's. A real quote starts with measuring the job.
| Job | Typical cost | Source |
|---|---|---|
| Paver patio installedInstalled, labor and materials | $10–$24 per sq ft | LawnStarter, November 2026 |
| Paver patio installedInstalled | $8–$25 per sq ft | This Old House, June 2026 |
How much paver base do I need?
Under a patio, pavers sit on 4 to 6 in of compacted gravel base. At 6 in, with 20% for compaction at 1.40 tons per yard, 100 sq ft takes 3.11 tons. A 12 × 16 ft patio needs 6 tons.
- Or cubic yards
- 4.5 yd³
- Area
- 192 sq ft
20% compaction, 1.40 t per yd³. Same math as the AreaPal app's paver estimate.
Tons = area × depth (in) ÷ 12 ÷ 27 × 1.20 × 1.40. The 20% is how much the base shrinks when it's compacted in 2 in lifts with a plate compactor.
| Depth | Tons | Cubic yards |
|---|---|---|
| 4 in | 2.07 | 1.48 |
| 6 in | 3.11 | 2.22 |
| 8 in | 4.15 | 2.96 |
| 12 in | 6.22 | 4.44 |
What slope does my patio need?
Slope (%) = rise ÷ run × 100. A patio or walk should fall about 1/4 in per foot (2%) away from the house. Over 10 ft that's 2½ in of drop. Type your rise in inches and the run in feet for percent, degrees and inches per foot.
- Inches per foot
- 0.25 in/ft
- Angle
- 1.19 °
Rise in inches, run in feet.
Percent = rise ÷ run × 100, with both in the same unit. Degrees = arctan(rise ÷ run). Inches per foot = rise (in) ÷ run (ft).
| Per foot | Percent | Degrees | Drop over 10 ft |
|---|---|---|---|
| 0.125 in | 1.04% | 0.6° | 1.25 in |
| 0.25 in | 2.08% | 1.19° | 2.5 in |
| 0.5 in | 4.17% | 2.39° | 5 in |
| 1 in | 8.33% | 4.76° | 10 in |
| 2 in | 16.67% | 9.46° | 20 in |
Work out the rest of the job
Pavers, answered
How many pavers are in a square foot?
4.5 of the common 4 × 8 in (holland) paver. Larger pavers: about 2 per sq ft for 6 × 9 in, 1 per sq ft for 12 × 12 in.
How deep should the base be under pavers?
4 to 6 in of compacted gravel for a patio or walk, 8 to 12 in for a driveway, plus 1 in of bedding sand on top.
How much extra pavers should I buy?
5% for straight running bond, 10% for 90° herringbone and 15% for 45° herringbone, circles or lots of curves.
How deep should paver base be?
4 to 6 in for walks and patios, 8 to 12 in for driveways, more on clay.
How much slope does a patio need?
About 1/4 in per foot, 2%, away from the house; 1/8 in per foot is the minimum for drainage.
Sources: 4.5 pavers per sq ft for 4 × 8 in pavers by geometry. Pattern waste (5–15%), 20% base compaction at 1.40 t per cu yd, 1 in of bedding sand and 60 sq ft per bag of polymeric sand: AreaPal app rules. The paver and sand makers' figures govern.
Imagery USDA NAIP 2023